Required Personal: 1
CT: 30 sec
SIEMENS control system, NI test system, Keyence vision system, Bosch conveying system, Festo grab and pneumatic system
Safety system: Pilz safety relay, Sick safety grating, and two-hand start
Automatic Switching and Torque Adjustment
Automatic Sorting and Flow of OK/NG Parts
Operators: 4
CT: 30 sec
Siemens control system, Keyence vision system, Bosch conveyor system, Atlas tightening system
Safety system: Pilz safety relays, SICK safety light curtains
Barcode scanning at the first station with automatic work order assignment

Consists of a stator assembly line, pre-assembly line, differential housing assembly line, clutch assembly line, EOL testing line, etc.
Production data connected with MES to ensure the quality and traceability
CT:81sec/ pcs
Required Personal: 57